As prescribed in 46.403(a)(93) insert the following clause:
INSTALLATION OF MEDICAL AND LABORATORY INSTRUMENTATION (APR 2008 MEDICAL) - DLAD
Installation shall include electrical and mechanical interconnection between components of the system. The contractor shall not be responsible for effecting the connection between power source and the control unit; but shall supervise the installation of this electrical line. Contractor installation shall not include rigging, carpentry work, plumbing, conduit, wire in conduit, junction boxes, line switches, or fuses. The contractor shall be responsible for visiting the site of installation, surveying power requirements, and, in accordance with customary trade practices, providing the Chief of Medical Materiel Services (CMMS) at the hospital with complete layout plans, room preparation drawings and instructions within __________ calendar days after award of contract. Such instructions shall specifically indicate the point at which responsibility for utility connection will be assumed by the contractor and shall indicate that material which is to be installed-furnished-contractor-installed. It shall be the responsibility of the Government to comply with the furnished drawings and/or instructions to provide for the proper installation. In addition, the contractor shall advise the activity as to the selection of the power supply required to feed the system. In all instances, when the system/equipment being procured or installed includes or will operate with other ancillary equipment, the contractor shall also furnish complete instructions and drawings which show interfacing of all system components.
(End of Clause)