As prescribed in 46.105-90 insert the following clause:
OPERATIONAL CHECK OF EQUIPMENT ITEMS (APR 2008 MEDICAL) - DLAD
Notwithstanding any other provision of this contract, the contractor/manufacturer shall perform an operational check on each piece of mechanical or electrical equipment to be supplied to the Government. The operational check shall demonstrate that the equipment is capable of performing all of the functions specified in the contract. This check shall be supported by inspection records which detail each operational check performed. A contractor/ manufacturer using an alternate procedure which provides a 100% check of all significant operations may use its procedure if prior approval by the contracting officer is obtained.
(End of Clause)