As prescribed in 46.407-97 insert the following clause:
REINSPECTION OF NONCONFORMING SUPPLIES
(APR 2008 SUBSISTENCE) - DLAD
(a) When origin inspection is performed by the U.S. Department of Agriculture or U.S. Department of Commerce and supplies are found to be nonconforming at origin, the Contractor may request USDA/USDC reinspection/formal review in accordance with the regulations of the respective agency. In such instances, the next larger available sample size will be used. The decision of the USDA/USDC representative as to conformance or nonconformance shall be final. It will be within the discretion of USDA/USDC whether to assess reinspection costs against the contractor.
(b) When origin inspection is performed by the USDA or USDC and supplies are found to be nonconforming at destination, the Contractor may petition the Contracting Officer to obtain permission for a single reinspection, provided such petition provides valid technical reasons to believe the destination inspection findings were erroneous. The reinspection shall be performed in accordance with the original destination inspection criteria unless otherwise specified by the Contracting Officer.
(1) Reinspection of nonconforming supplies for grading factors, suspicion of fraud or substitution shall be conducted by the applicable origin inspection agency (USDA for meats and poultry, or USDC for waterfoods). All costs associated with USDA/USDC reinspection shall be borne by the Contractor; unless the reinspection results establish compliance with contractual requirements, in which case costs shall be borne by the Government.
(2) Reinspection for all other criteria shall be accomplished by the Military Medical/Veterinary Services, as coordinated by the Contracting Officer with the applicable Military Medical/Veterinary Service Headquarters. The Military Medical/Veterinary Service Headquarters will designate the activity assigned to perform the reinspection and advise the Contracting Officer and the designated activity of the reinspection schedule. Reinspection shall be performed by personnel other than those involved in the original destination inspection. Reinspection costs shall be borne by the Contractor when reinspection results substantiate the nonconformance. The Government shall bear the costs of reinspection if the products are determined to be in compliance with contractual requirements.
(c) When inspection by the USDA or USDC is not a contract requirement and supplies are found nonconforming at destination, the Contractor may petition the Contracting Officer one time only to obtain permission for a single reinspection, provided such petition provides valid technical reasons to believe the original inspection findings were erroneous. If the Contracting Officer authorizes a reinspection, the reinspection results shall be final if they differ from the original inspection to such a statistically significant degree that error in the original results is probable. Otherwise, the original inspection results shall prevail. The reinspection/formal review shall be performed in accordance with the original inspection criteria, unless otherwise specified. All costs associated with the reinspection shall be borne by the Contractor; unless the reinspection results establish compliance with the contract requirements, in which case costs shall be assumed by the Government. Reinspection shall not be authorized when original inspection findings show that the supplies are unwholesome or contain a deleterious substance.
(d) The Contractor may elect to petition the Contracting Officer to grant a waiver of those contract requirements for which supplies have been found nonconforming and accept the supplies “as is” with appropriate price consideration. However, if the Contractor intends to exercise any option under (a), (b) or (c) above, the Contractor must do so prior to requesting a waiver. The denial of a waiver by the Contracting Officer will result in final rejection of the nonconforming supplies without recourse to reinspection.
(End of Clause)