Reference

More Resources

 

Section 5452.215-9020: Instructions for Submitting Product Demonstration Models (PDM) for Supply Chains at DSCP

As prescribed in 15.308-93 insert the following provision:

INSTRUCTIONS FOR SUBMITING PRODUCT DEMONSTRATION MODELS (PDM) FOR SUPPLY CHAINS AT DSCP

(APR 2008) - DLAD

(a) The offeror shall submit Product Demonstration Models (PDM), as specified below, as part of its proposal. Models will be submitted at no expense to the Government and must be received prior to the time and date set forth for closing of offers. PDMs will be returned at the offeror’s request and expense so long as the PDM(s) is(are) not destroyed by testing, retained by the Government as a manufacturing standard, and/or unless otherwise specified by the solicitation. PDMs will become Government property unless return is requested within 30 days after date of award.

    Item Number _________ No. of Units Required _____________

(b) Models will be tested or evaluated to determine compliance with all characteristics specified for such test or evaluation as referenced in FAR 15.3. Failure of models to conform to all such characteristics may result in the rejection of the entire offer. Failure to furnish models by the time and date specified in the solicitation may be cause for rejection of the entire offer if not otherwise acceptable under the provisions for considering late offers.

The following applies only when checked as paragraph (c):

[ ] If the PDM will be used as a manufacturing standard, for the successful offeror(s), the Government will return one approved Product Demonstration Model (PDM) which will serve as a manufacturing standard. Products delivered under any resulting contract shall conform to the approved model as to the characteristics listed for test or evaluation and shall conform to the specification/commercial product description characteristics.

[ ] It is preferred that the materials used to manufacture the PDM(s) be in accordance with any specifications defined in Section C of this solicitation. However, if the offeror uses alternate materials to manufacture the PDM(s) a letter must be supplied with them stating (i) which materials depart from the end item specification and (ii) that, although the materials used in producing the PDM(s) differ from those specified, the materials required by the specification will be utilized under any resultant contract.

NOTE: The use of alternate materials will not affect the rating of the PDM, either favorably or negatively when the use of the alternate materials is identified in accordance with the requirements of this section. However, the Government reserves the right to give a negative rating to (a) PDM(s) that is(are) made with materials that depart from the end item specification and the use of those alternate materials was not identified in accordance with the requirements of this section. Accordingly, to preclude a negative assessment of a PDM that is comprised of materials that are not in accordance with the specification(s), it is in the offeror's best interest to identify any and all alternate materials that have been used.

Although the offeror is permitted to use alternate materials to construct the PDM(s), the offeror is not permitted to utilize alternate manufacturing operations or change the construction/design of the PDM. The PDM must be manufactured (i) at the same facility as the production quantity and (ii) must be in accordance with applicable specifications, including the placement of the labels, unless otherwise identified. However, labels need not be printed for the purpose of the PDM but there must be an indication as to the size of the PDM, when applicable."

(End of Provision)




Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/fars/section.php on line 347

Fatal error: require(): Failed opening required '../../includes/site_footer.php' (include_path='.:/usr/local/lib/php') in /home/simplyauto/www/regs/fars/section.php on line 347