As prescribed in 11.204-100 insert the following clause:
DRAWING LIMITATIONS (TACOM DLR - LAND AND MARITIME SUPPLY CHAIN) (JUL 2009) - DLAD
(a) The drawings supplied with this contract are not shop or process drawings. They are engineering design drawings that are adequate to permit manufacture, depict the completed (item(s), and serve as the basis for inspection of the completed item(s).
(b) The drawings DO NOT cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if the Contractor meets all the dimensions and tolerances specified in the engineering design drawing for each individual part, a cumulative unacceptable fit for the contract item could result.
(c) THE CONTRACTOR IS RESPONSIBLE for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.
(d) The Contractor agrees that it has obtained all specifications and drawings necessary to manufacture the items being solicited in accordance with the Technical Data Package (TDP), including all incorporated specifications and drawings. The Contractor is responsible for having all drawings and specifications. Delivery delays are not excusable where the Contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from the Contracting Officer prior to the solicitation closing date.
(e) If the Contractor fails to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, the Contractor shall be responsible for correcting this condition at no additional cost to the Government and no delivery schedule extension.
[End of Clause]