Section 5452.211-9026: Delays in Shipment of Products Requiring USDA Laboratory Analysis

As prescribed in 11.404-91 insert the following clause:

DELAYS IN SHIPMENT OF PRODUCTS REQUIRING USDA LABORATORY ANALYSIS (SEP 2007) - DLAD

The specifications of this contract require a USDA Laboratory Analysis of samples of the product to be delivered. Offerors should consider this requirement when submitting offers so that appropriate consideration is given to planning production schedules. If there are delays in performing the USDA analysis of the samples, or if there are delays in receiving the USDA analysis due to the postal service, the contractor shall so notify the contracting officer. An extension in shipping time may be authorized when the conditions of (a) below, and if applicable, (b) below are satisfied.

(a) When all production lots intended in offered units were produced at least 12 calendar days in advance of the required delivery date (RDD) specified in the contract, and the laboratory results for the samples taken from these production lots are not made available to the contractor by the estimated shipping date (defined as date scheduled to ship in order to meet the RDD), the RDD will be extended by that number of days that receipt of the results by the contractor exceeds the estimated shipping date. (The adjusted RDD will be computed beginning with the day following receipt of the analysis from the USDA Laboratory.)

EXAMPLE:

      RDD

      Shipping Date

      Receipt of Analysis

      Adjusted RDD

      30 Nov

      27 Nov

      28 Nov

      1 Dec

        (b) If provisions in (a) above are met and the contractor elects to use a reserve sample for any production lot, an added extension to the RDD will be made on the formula provided above when the following conditions are met:

        (1) The contractor notifies the USDA Inspector to mail the reserve sample within one day after the contractor is notified of results on the original sample (if notification is received on Saturday, the reserve sample is to be mailed no later than the next business day), and

        (2) The reserve sample is in compliance with specifications.

        (End of Clause)