Reference

More Resources

 
FARS

Section 414.407-4: Mistakes after award.

If a mistake in bid is disclosed after award, the contracting officer shall make a final determination in accordance with the provisions of FAR 14.407-4(b) and (c) and shall coordinate each proposed determination with OGC. Such coordination shall, at a minimum, consist of the contracting officer providing the proposed determination and the case file to OGC for comment.




Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/fars/section.php on line 347

Fatal error: require(): Failed opening required '../../includes/site_footer.php' (include_path='.:/usr/local/lib/php') in /home/simplyauto/www/regs/fars/section.php on line 347