|
|
DSCR I217A: SPECIAL TOOLING
Deprecated: Function mysql_numrows() is deprecated in /home/simplyauto/www/regs/supplycenters/dscr/clause.php on line 182
Section: I
DPACS Code: I217A
BSM Code: I45A17
Clause Number: DEV:52.245-17
Type: LOCAL
Clause last updated: 1984-04
|
Date of text: 1984-04 (current version)
I217A 52.245-17 SPECIAL TOOLING (DEVIATION) (APR 1984)
AND
I45A17
(a) Definition. "Special tooling" means jigs, dies, fixtures,
molds, patterns, taps, gauges, other equipment and manufacturing
aids, all components of these items, and replacement of these
items, that are of such a specialized nature that without
substantial modification or alteration their use is limited to
the development or production of particular supplies or parts
thereof or performing particular services. It does not include
material, special test equipment, facilities (except foundations
and similar improvements necessary for installing special
tooling), general or special machine tools, or similar capital
items. Special tooling, for the purpose of this clause; does
not include any it em acquired by the Contractor before the
effective date of this contract, or replacement of such
items, whether or not altered or adapted for use in
performing this contract, or items specifically excluded by
the Schedule of this contract.
(b) Use of special tooling. The Contractor agrees to use
the special tooling only in performing this contract or as
otherwise approved by the Contracting Officer.
(c) Initial list of special tooling. If the Contracting
Officer so requests, the Contractor shall furnish the Government
an initial list of all special tooling acquired or manufactured
by the Contractor for performing this contract (but see paragraph
(d) for tooling that has become obsolete). The list shall
specify the nomenclature, tool number, related product part number
(or service performed), and unit or group cost of the special
tooling. The list shall be furnished within 60 days after
delivery of the first production end item under this contract
unless a later date is prescribed.
(d) Changes in design. Changes in the design or
specifications of the end items being produced under this contract
may affect the interchangeability of end item parts. In such an
event, unless otherwise agreed to by the Contracting Officer, the
Contractor shall notify the Contracting Officer of any part not
interchangeable with a new or superseding part. Pending
disposition instructions, such usable tooling shall be retained
and maintained by the Contractor.
(e) Contractor's offer to retain special tooling. The
Contractor may indicate a desire to retain certain items of
special tooling at the time it furnishes a list or notification
pursuant to paragraphs (c) (d), or (h) of this clause. The
Contractor shall furnish a written offer designating those items
that it wishes to retain by specifically listing the items or by
listing the particular products, parts, or services for which the
items were used or designed. The offer shall be made on one of
the following bases:
(1) An amount shall be offered for retention of the
items free of any Government interest. This amount should
ordinarily not be less than the current fair value of the items,
considering among other things, the value of the items to the
Contractor for use in future work.
(2) Retention may be requested for a limited period
of time and under terms as may be agreed to by the Government
and the Contractor. This temporary retention is subject to
final disposition pursuant to paragraph (i) of this clause.
(f) Property control records. The Contractor shall maintain
adequate property control records of all special tooling in
accordance with its normal industrial practice. The records shall
be made available for Government inspection at all reasonable
times. To the extent practicable, the Contractor shall identify
all special tooling subject to this clause with an appropriate
stamp, tag, or other mark.
(g) Maintenance. The Contractor shall take all reasonable
steps necessary to maintain the identity and existing condition
of usable items of special tooling from the date such items are
no longer needed by the Contractor until final disposition under
paragraph (i) of this clause. These maintenance requirements do
not apply to those items designated by the Contracting Officer
for disposal as scrap or identified as of no further interest
to the Government under paragraph (i) (4) of this clause. The
Contractor is not required to keep unneeded items of special
tooling in place.
(h) Final list off special tooling. When all or a
substantial part of the work under this contract is completed or
terminated, the Contractor shall furnish the Contracting Officer
a final list of special tooling with the same information as
required for the initial list under paragraph (c) of this clause.
The final list shall include all items not previously reported
under paragraph (c). The Contracting Officer may provide a
written waiver of this requirement or grant an extension. The
requirement may be extended until the completion of this contract
together with the completion of other contracts and subcontracts
authorizing the use of the special tooling under paragraph (b) of
this clause. Special tooling that has become obsolete as a result
of changes in design or specification need not be reported
except as provided for in paragraph (d).
(i) Disposition instructions. The Contracting Officer shall
provide the Contractor with disposition instructions for special
tooling identified in a list or notice submitted under paragraphs
(c), (d), or (h) of this clause. The instructions shall be
provided within 90 days of receipt of the list or notice, unless
the period is extended by mutual agreement. The Contracting
Officer may direct disposition by any of the methods listed in
subparagraphs (1) through (4) of this paragraph, or a combination
of such methods. Any failure of the Contracting Officer to
provide specific instructions within the 90 day period shall be
construed as direction under subparagraph (i)(3).
(1) The Contracting Officer shall give the
Contractor a list specifying the products, parts, or services
for which the Government may require special tooling and
request the Contractor to transfer title (to the extent not
previously transferred under any other clause of this
contract) and deliver to the Government all usable items of
special tooling that were designed for or used in the
production or performance of such products, parts, or
services and that were on hand when such production or
performance ceased.
(2) The Contracting Officer may accept or reject
any offer made by the Contractor under paragraph (e) of this
clause to retain items of special tooling or may request
further negotiation of the offer. The Contractor agrees to
enter into the negotiations in good faith. The net proceeds
from the Contracting Officer's acceptance of the Contractor's
retention offer shall either be deducted from amounts due the
Contractor under this contract or shall be otherwise paid to
the Government as directed by the Contracting Officer.
(3) The Contracting Officer may direct the Contractor
to sell, or dispose of as scrap, for the account of the
Government, any special tooling reported by the Contractor
under this clause. The net proceeds of all sales shall either
be deducted from amounts due the Contractor under this
contract or shall be otherwise paid to the Government as
directed by the Contracting Officer. To the extent that the
Contractor incurs any costs occasioned by compliance with such
directions, for which it is not otherwise compensated, the
contract price shall be equitably adjusted in accordance with
the Changes clause of this contract.
(4) The Contracting Officer may furnish the Contractor
with a statement disclaiming further Government interest or
rights in any of the special tooling listed.
(j) Storage or shipment. The Contractor shall promptly
transfer to the Government title to the special tooling
specified by the Contracting Officer and arrange for either
the shipment or the storage of such tooling in accordance
with the final disposition instructions in subparagraph
(i)(1) of this clause. Tooling to be shipped shall be
properly packaged, packed, and marked in accordance with the
directions of the Contracting Officer. Tooling to be stored
shall be stored pursuant to a storage agreement between the
Government and the Contractor, and as directed by the
Contracting Officer. Tooling shipped or stored shall be
accompanied by operation sheets or other appropriate data
necessary to show the manufacturing operations or processes
for which the items were used or designed. To the extent
that the Contractor incurs costs for authorized storage or
shipment under this paragraph and not otherwise compensated
for, the contract price shall be equitably adjusted in
accordance with the Changes clause of this contract.
(k) Subcontract provisions. In order to perform this
contract, the Contractor may place subcontracts (including
purchase orders) involving the use of special tooling. If
the full cost of the tooling is charged to those
subcontracts, the Contractor agrees to include in the
subcontracts appropriate provisions to obtain Government
rights comparable to the rights of the Government under this
clause (unless the contractor and the Contracting Officer
agree that such rights are not of substantial interest to the
Government). The Contractor agrees to exercise such rights
for the benefit of the Government as directed by the
Contracting Officer.
Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/supplycenters/dscr/clause.php on line 369
Fatal error: require(): Failed opening required '../../../includes/site_footer.php' (include_path='.:/usr/local/lib/php') in /home/simplyauto/www/regs/supplycenters/dscr/clause.php on line 369
|