Reference

More Resources

 

Section 5452.246-9061: Warranty of Industrial Plant Equipment (IPE) - FSG 34

As prescribed in 46.710-94 insert the following clause:

WARRANTY OF Industrial Plant Equipment (IPE) - FSG 34 (SEP 2008) - DLAD

(a) Definitions: "Acceptance," as used in this clause, means the act of an authorized representative of the Government by which the Government assumes for itself, or as an agent of another, ownership of existing and identified supplies, or approves specific services rendered, as partial or complete performance of the contract. "Supplies," as used in this clause, means the end items furnished by the Contractor and related services required under this contract. The word does not include "Data."

(b) Contractor's obligations.

(1) The Contractor warrants that for one (1) year all supplies furnished under this contract will be free from defects in material and workmanship and will conform with all requirements of this contract. Warranty period begins from the date of acceptance.

(2) Any supplies or parts thereof corrected or furnished in replacement by the Contractor shall be subject to the conditions of this clause to the same extent as supplies initially delivered.This warranty shall be equal in duration to that set forth in paragraph (b)(1) of this clause and shall run from the date of delivery of the corrected or replaced supplies.

(3) When the machine is inoperable because of a defect, deficiency and/or nonconformance subject to the Contractor's warranty, and after the Contractor has received written notice of the defect, deficiency or nonconformance, the warranty shall be extended for the time period during which the machine was inoperable (i.e., length of time from when Contractor receives notification until machine is operable.)

(4) The Contractor shall not be obligated to correct or replace supplies if the facilities, tooling, drawings, or other equipment or supplies necessary to accomplish the correction or replacement have been made unavailable to the Contractor by action of the Government. In the event that correction or replacement has been directed, the Contractor shall promptly notify the Contracting Officer, in writing, of the non-availability.

(5) The Contractor shall also prepare and furnish to the Government data and reports applicable to any correction required (including revision and updating of all affected data called for under this contract) at no increase in the contract price.

(6) When supplies are returned to the Contractor, the Contractor shall bear the transportation costs from the place of delivery specified in the contract (irrespective of the f.o.b. point or the point of acceptance) to the Contractor's plant and return. When defective items are returned to the Contractor from other than the place of delivery specified in the contract, or when the Government exercises alternate remedies, the Contractor's liability for transportation charges incurred shall not exceed an amount equal to the cost of transportation by the usual commercial method of shipment between the place of delivery specified in the contract and the Contractor's plant and subsequent return.

(7) The warranties expressed herein are in lieu of any implied warranties of merchantability and “fitness for a particular purpose”.

(c) Remedies Available to the Government.

(1) In the event of a breach of the Contractor's warranty in paragraph (b)(1) and (b)(2) of this clause, the Government may, at no increase in contract price-

(i) Require the Contractor, at the place of delivery specified in the contract (irrespective of the f.o.b. point or point of acceptance) or at the Contractor's plant, to repair or replace, at the Contractor's election, defective or nonconforming supplies, or

(ii) Require the Contractor to furnish at the Contractor's plant the materials or parts and installation instructions required to successfully accomplish the correction.

(iii) Where it is impracticable for the Government to pursue remedies at (i) and (ii), the Government may arrange for the repair or replacement of defective or nonconforming supplies by the Government or by another source at the Contractor's expense. Where the Government is to accomplish the repair, the Contractor at the Government's option will furnish the material or parts and the instruction required to successfully accomplish the repair.

(2) If the Contracting Officer does not require correction or replacement of defective or nonconforming supplies or the Contractor is not obligated to correct or replace under paragraph (b)(4) of this clause, the Government shall be entitled to an equitable reduction in the contract price.

(3) The Contracting Officer shall notify the Contractor in writing of any breach of the warranty in paragraph (b) of this clause within a reasonable period, but not later than 45 days after discovery of the defect. The Contractor shall submit to the Contracting Officer a written recommendation within 2 working days as to the corrective action required to remedy the breach. After the notice of breach, but not later than 5 days after receipt of the Contractor's recommendation for corrective action, the Contracting Officer may, in writing, direct correction or replacements in paragraph (c)(1) of this clause, and the Contractor shall, notwithstanding any disagreement regarding the existence of a breach of warranty, comply with this direction within 5 days of receipt. If it is later determined that the Contractor did not breach the warranty in paragraph (b)(1) and (b)(2) of this clause, the contract price will be equitably adjusted.

(4) If supplies are corrected or replaced, the period for notification of a breach of the Contractor's warranty in paragraph (c)(3) of this clause shall be 45 days from the discovery of the defect.

(5) The rights and remedies of the Government provided in this clause are in addition to and do not limit any rights afforded to the Government by any other clause of the contract.

(6) The Contractor shall be liable for the reasonable costs of disassembly and/or reassembly of larger items when it is necessary to remove the supplies to be inspected and/or returned for correction or replacement.

NOTE: FAR CLAUSE 52.246-18 IS APPLICABLE ONLY IF ITEM(S) ARE PLACED IN USE WITHIN THE LAND AREA OF THE UNITED STATES CONTIGUOUS TO THE 48 STATES.

(End of Clause)