As prescribed in 46.601-90 insert the following clause:
MATERIAL AND INSPECTION REPORT (APR 2008) - DLAD
(a) The Contractor shall create a Receiving Report in Wide Area Workflow Receipt and Acceptance (WAWF-RA), which serves as the Material Inspection and Receiving Report (MIRR)) (DD Form 250). Once the Receiving Report is created and the Government has accepted the material, an electronic signature of the Government representative responsible for acceptance will appear on the Receiving Report.
(b) In addition to the Receiving Report via WAWF-RA, the Contractor shall include hard copies of the Receiving Report (which includes an electronic signature of the Government representative responsible for acceptance if acceptance is at origin) in the exterior and interior shipping documentation.
(End of Clause)