As prescribed in 46.392 insert the following clause:
PRODUCT VERIFICATION TESTING (JUL 2008) - DLAD
(a) The requirements of FAR clause 52.246-2, “Inspection of Supplies-Fixed Price,” American National Standards Institute (ANSI)/American Society for Quality Control (ASQC) Z1.4-1993, “Sampling Procedures and Tables for Inspection by Attributes,” apply. These documents form the basis for the Government’s right to perform product verification testing (PVT) of this product. FAR 52.246-2 is hereby incorporated by reference into the contract if not otherwise called out in the purchase document. The current version of ANSI/ASQC Z1.4 can be found at http://asq.org. The private sector and non-DOD agencies may purchase copies of ANSI/ASQC Z1.4 from the American Society for Quality Control, P.O. Box 3005, 611 E. Wisconsin Avenue, Milwaukee, WI 53201-4606.
(b) The Contractor is responsible for ensuring that supplies are manufactured, produced, and subjected to all tests required by applicable material specifications/drawings specified in the purchase description of the contract. Notwithstanding any other clause to the contrary, and/or in addition thereto, the Government reserves the right to conduct PVT to ascertain if any or all requirements of the purchase identification description contained elsewhere herein are met prior to final acceptance.
(c) On any given contract, the Government may require PVT through a Government-designated testing laboratory on the contract or production lot at Government expense to verify
conformance. When the contract is designated by the Procurement Contracting Officer (PCO)/Administrative Contracting Officer (ACO) for PVT, the Government Quality Assurance Representative (QAR) will select a random sample, from lots presented by the contractor for Government acceptance, to verify that the entire lot tendered meets the requirements of the contract or during production to ensure critical manufacturing processes are in control and send the samples to a Government-designated laboratory for testing at the Government’s expense. The PVT samples shall be shipped with a copy of the DD Form 250, a DD Form 1222 (as prepared in coordination with the QAR) and marked as follows: “PRODUCT VERIFICATION TEST SAMPLES, Contract No._____________, Lot/Item No.________________." Upon shipment of the PVT samples, the original unsigned DD Form 250, along with a copy of the DD Form 1222, shall be submitted to the PCO.
Upon notification to the contractor that PVT is invoked, the contractor shall not ship any material from the sampled lot until the contractor receives notification of acceptable PVT results. Government reserves the right to reject the lot, or withhold payment if the contractor ships prior to Government approval of the PVT. The Government will notify the Contractor of the results of the testing within 15 working days after receipt of the samples by the Government.
(d) Samples subjected to PVT are deemed to be part of the contract quantity. Samples destroyed during testing will be paid for at the contract price, provided the samples pass PVT. Those samples not destroyed during PVT will be returned to the Contractor at the Government's expense and will be included as part of the total contract quantity within the limits of the quantity variation clause specified in the contract.
(e) The Contractor will not be paid for those samples destroyed during testing which fail PVT. Such failure will result in rejection of the entire contract lot from which the samples were taken. Those samples from a rejected lot which were not destroyed during PVT may be returned to the Contractor at the Contractor's request and expense.
(f) [This subparagraph pertains only to contracts and bilateral purchase orders.]
(1) The QAR will evaluate the test results and accept or reject the rest of the production lot based on those results. At acceptance, the QAR is authorized to notify the contractor and send copies of the report to the Product Verification Program (PVP) Office and the PCO. If the Government fails to act within the period set forth herein for notification, the Contracting Officer shall, upon timely written request, equitably adjust, under the Changes clause of this contract, the delivery or performance dates and/or the contract price and any other contractual terms affected by the delay. The Government is not required to accept/reject the supplies tendered until after receipt of the PVT results.
(2) The Government shall have the option to require the contractor to screen the entire lot tendered for any defects noted by the PVT. Any defects found shall be corrected before re-tendering the lot for acceptance by the Government. Furthermore, the Government may subject this lot to additional PVT. If the Government disapproves the lot tendered for acceptance because of a failure to pass PVT, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract. In such case, the Government reserves all rights to remedies to which it is otherwise entitled by law, regulation, or this contract.
(g) [This subparagraph pertains only to unilateral purchase orders.]
(1) The QAR will evaluate the test results and accept or reject the rest of the production lot based on those results. At acceptance, the QAR is authorized to notify the contractor and send copies of the report to the PVP Office and the PCO. The Government is not required to accept/reject the supplies tendered until after receipt of the PVT results.
(2) The Government shall have the option to require the contractor to screen the entire lot tendered for any defects noted by the PVT. Any defects so found shall be corrected before re-tendering the lot for acceptance by the Government. Furthermore, the Government may subject this lot to additional PVT. If the Government disapproves the lot tendered for acceptance because of a failure to pass the PVT, the Government has the right to reject the entire offer, thereby releasing the parties from further obligations under the purchase order.
Alternate I When acquiring Packaged Petroleum Products, use the following paragraph (c) in lieu of paragraph (c) in the basic clause:
(c) On any given contract, the Government may require PVT through a Government-designated testing laboratory on a lot tendered for acceptance or during production on a number of samples
at the Government’s expense. However, the provision of sample containers and all costs associated with the transportation of samples to and from the testing facility will be the responsibility of the Contractor. The samples will be sent to a Government-designated testing laboratory for PVT. Testing will consist of chemical and/or mechanical/dimensional conformance tests as the Government deems necessary to verify conformance to contract requirements. When the contract designates such test, the Government QAR will conduct lot acceptance testing, which is required on 100 percent of lots produced and will observe the Contractor in the packaging and shipment of the samples to the designated laboratory for testing. The QAR will perform the evaluation and accept or reject the samples. Upon acceptance, the QAR is authorized to notify the contractor and send copies of the report to the PVP Office and the PCO. The Contractor shall not delay shipment of the supplies pending receipt of PVT results unless specifically directed to do so by the QAR or Contracting Officer. The Government reserves the right to hold acceptance until after receipt of the PVT results.
Alternate II When acquiring Heat and Die Number requirements, use the following paragraphs (c) (1) and (c) (2) in addition to paragraph (c) in the basic clause.
(c) (This paragraph applies only when "HEAT NUMBER" or "DIE NUMBER" requirements are in the contract description or specifications. It shall take precedence over any provisions of this contract or of this PVT clause which are inconsistent herewith.)
(1) If the contract description or specifications require that the supplies be identified by "HEAT NUMBER" or "DIE NUMBER", the selection of samples on a random basis in accordance with paragraph (c) above shall be from each "HEAT" or "DIE NUMBER" lot which is included in the production lot or contract lot tendered for acceptance.
(2) Subparagraph (h)(2) above is modified to provide that, if the PVT reveals nonconformities in the chemical or mechanical properties of the samples tested, the nonconformities shall be cause for rejection of the entire "HEAT" or "DIE NUMBER" lot included in the production or contract lot. Any "HEAT" or "DIE NUMBER" lot that is rejected may not be re-tendered for Government inspection and acceptance.
Alternate III When acquiring Instrument Bearings, use paragraphs (a) and (c) in addition to the basic clause and paragraph (b) in lieu of paragraph (c) in the basic clause.
(a) When PVT is a requirement, the Contractor shall notify the PCO and the QAR in writing at least 30 calendar days before anticipated completion of manufacture of the contract quantity or first manufacturing lot. This is to allow for sufficient time for scheduling and PCO coordination with the Government test facility.
(b) In the event that the Government test activity performs destructive testing on any of the PVT samples, the Contractor shall receive the full contract unit price for that sample or samples as long as the testing found that sample or samples to be in conformance with technical requirements. PVT samples determined to be conforming and not destroyed or degraded in testing shall be returned, by the Government test activity, to the contractor at Government expense. The Contractor shall examine the returned PVT samples, refurbish as necessary, and may include them in the production quantity if found to be unharmed by the PVT.
(c) The PCO may waive the requirement for PVT where supplies being offered are identical to supplies that were accepted by the Government within a period of two years prior to the date of current solicitation. Offerors offering such products, who wish to rely on such prior acceptance by the Government, must furnish evidence with the offer that prior Government acceptance is presently appropriate for the products to be furnished hereunder by indicating below the information for identical supplies accepted by the Government.
GOV AGENCY_______________________________________________
CONTRACT NO._____________________________________________
DATE OF CONTRACT_________________________________________
NSN______________________SPEC/PART NO.___________________
In all cases, the PCO reserves the right to make final waiver determination.
The contract delivery schedule shall be reduced by 30 calendar days (time allotted for submission and approval of PVT sample(s)) if submission of PVT sample(s) is waived by the Government.