Section 5452.217-9006: Surge and Sustainment (S&S) Requirements (Jun 2009)

This solicitation includes items that are critical to support the Department of Defense’s ability to conduct contingency operations. These items are designated as the S&S requirements, including the Services’ go-to-war requirements. S&S requirements are identified in the schedule of supplies as monthly wartime rate (MWR) or D1-D6 schedule in the solicitation, and are in addition to peacetime quantities. The objective of this requirement is to obtain contractual coverage to meet the S&S quantities and sustainable accelerated delivery specified in this solicitation. S&S coverage includes access to production capability as well as vendor owned or managed inventory/safety stocks. Offerors will be evaluated on their ability to meet the terms and conditions of the S&S requirements. S&S requirements are defined as follows:

a. Surge and Sustainment Capability means the ability of the supplier to meet the increased quantity and/or accelerated delivery requirements, using production and/or supplier base capabilities, to support increased requirements with accelerated delivery, such as for DOD contingencies or emergency peacetime requirements. This capability includes both the ability to ramp-up to meet accelerated delivery and/or increased quantities (i.e., Surge), as well as to sustain an increased production and delivery pace throughout the contingency (i.e., Sustainment). The spectrum of possible contingencies ranges from major theater wars to smaller-scale military operations.

b. S&S Quantity and Accelerated Delivery Schedule are identified on an individual item basis, based on the Services’ wartime planning requirements. The surge quantities are identified by Monthly Wartime Rate (MWR) as a percentage or an exact number; however, some items may require different delivery schedule such as D1-D6 schedule. The S&S quantity and delivery requirements are above and beyond the peacetime requirements.

c. S&S Capability Assessment Plan (CAP), (previously referred to as the “Surge Plan”). The CAP provides the offeror’s method of covering S&S requirements, identification of competing priorities for the same resources, and date the contractor can provide the required S&S capability. If any of the S&S quantity and delivery requirements cannot be met, the offeror must identify the shortfall and provide the best value solutions to include a proposed investment strategy to offset the shortfall. For example, the CAP may include, but is not limited to, one of the following scenarios to address wartime delivery requirements:

(1) The S&S quantity and delivery requirements can be fully covered within the supplier’s resources.

(2) The S&S delivery schedule can be fully covered with early deliveries due to unit pack shipping (e.g., S&S quantity and delivery requirements is for 10 feet of wire every 30 days, and the wire is sold to the government in 100 ft rolls. A single delivery of one roll in the first 30 days would meet the requirement for ten 30-day delivery periods).

(3) The total S&S quantity and delivery requirements can be met but at a different delivery rate, and the supplier has no cost-effective investment strategy that would improve the capability to deliver according to the quantity and delivery requirements (e.g., the schedule calls for 20 o-ring seals each 30-day period, but the vendor needs a 30 day ramp-up and could deliver 40 in the second period and 20 each delivery period thereafter).

(4) The total S&S quantity and delivery requirements can be met but at a different delivery rate, and includes an investment strategy that would improve the supplier’s capability to deliver according to the MWR or D1-D6 (e.g., the schedule calls for 20 seals each 30-day period, and the vendor can meet the schedule starting in the third ordering period but needs a Government investment to be capable of meeting deliveries in the first two months).

(5) The S&S quantity and delivery requirements can be partially covered (the supplier can only provide a fraction of the total quantities specified); however, the supplier has no cost-effective investment strategy that would improve the capability to deliver at the MWR or D1-D6.

(6) The S&S quantity and delivery requirements can be partially covered (the supplier can only provide a portion of the MWR or D1-D6 quantities specified), and includes an investment strategy that would improve the supplier’s capability to deliver at the MWR or D1-D6.

(7)The S&S quantity and delivery requirements cannot be met with existing resources, and there is no cost effective solution to improve the industrial capability to deliver at the MWR or D1-D6.

d. Stock Rotation Plan. The CAP must include a stock rotation plan for Government or supplier S&S investments (e.g., lead-time materials that are purchased using Warstopper funding) to ensure the newest materials are available for production. The stock rotation plan must not preclude the supplier from making the surge deliveries.

e. Exit Strategy. The CAP must include a proposed exit strategy describing how to transition and ramp-down S&S assets and/or Government investment. The exit strategy must be designed to conserve protected S&S resources when (1) the contract expires, (2) a follow-on contract transitions to another supplier and/or (3) the requirement is reduced or eliminated by the requiring customer(s). The exit strategy must consider peacetime demand patterns, production run levels, normal lead-times for raw materials used in the production process, and other relevant factors, and address least cost/best-value alternatives that minimize the risk of unused raw materials or the untimely disposition of other serviceable S&S assets before the contract expires.

f. Government Investments. Use of Government investment may be considered to address S&S coverage shortfalls as specified under (c)(3) to (7) above when it is in the Government’s best interest. Use of Government investment is limited per clause 52.217-9010. Contracting Officer (CO) approval is required for any Government investment request and any investment costs incurred by the supplier without the explicit written approval of the CO are the sole responsibility of the supplier.

g. S&S Validation/Test Plan. In most cases, the Government will develop a validation/test plan prior to verifying the supplier’s capability against the required S&S CAP and the Schedule. Upon request, the supplier shall submit a S&S validation/test plan that defines how the S&S capability can be verified when (1) complex industrial and manufacturing processes are involved, or (2) the supplier methodologies for gaining visibility over supplier base capabilities within an existing structure to enable a more cost effective alternative. In any case, a validation/test plan will be developed prior to any validation/testing of the supplier’s S&S capability.

h. Agreement to Participate in S&S Validation/Testing. By submission of an offer, the supplier agrees to participate in S&S validation/testing as required by the Government to verify the S&S capability as described in the approved CAP. Validation/Testing may include any methodology that can verify the supplier’s S&S capability. Validations will be conducted on randomly selected items by the Industrial Specialist after contract award and may be conducted throughout the contract period. Validation includes, but is not limited to, verification that the supplier and any subcontractor(s) have sufficient equipment, facilities, personnel, stock, pre-positioned raw material, production capabilities, visibility of supplier base resources and agreements, networks and plans for distribution (receiving, storing, packaging and issuing) and transportation services to accommodate the S&S requirements in the contract. This validation includes examination of any in-house work, review of the stock rotation plan (if applicable), and other contracts that impact the production of any added or accelerated quantities. The Government reserves the right to require validation using other methodologies when deemed appropriate by the Contracting Officer. The language in this clause does not limit the Government's right, at any time after award, to perform inspections or validate the supplier's S&S capability.

i. Supplier Notification of S&S Capability Changes. The supplier agrees to maintain S&S capability to produce and/or deliver the S&S quantity identified in the Schedule of Supplies in accordance with the approved CAP and S&S terms and conditions throughout the life of the contract. Changes that negatively impact S&S capability must be reported in writing to the CO within ten (10) working days after the supplier becomes aware of such an impact. Such notification must include a revised S&S CAP with the supplier’s proposed corrective action(s) and date when the supplier can attain the required S&S capability. Refer to 52.217-9007(a) for instructions on submitting changes to the CAP.

j. Government Changes, Additions and Deletions to S&S Coverage. The identification of new S&S items in the peacetime schedule or increases in quantities of items already in the S&S schedule must be done through bilateral contract modifications. Deletion of S&S requirements or decreases in quantities will be made by the Government through unilateral contract modifications. The government reserves the right to obtain S&S requirements from other sources without liability to the supplier. This language does not relieve the supplier of the responsibility to provide, in accordance with the applicable delivery schedule, non-S&S and S&S quantities agreed to in the Schedule and CAP during the contingency.

k. Early or Unexpected S&S Requirements. The supplier shall support S&S requirements to the maximum extent practical (1) prior to the supplier achieving full S&S capability agreed to in the Schedule and the CAP, and (2) for requirements exceeding those agreed upon in the Schedule and the CAP, if agreed to by the contractor and not exceeding any applicable contract maximum dollar value or quantity. The Government reserves the right to obtain S&S requirements from other sources without liability to the supplier.

l. S&S Execution. The Government will issue a surge order or series of orders equaling the MWR or D1-D6 each month, when executing S&S requirement. S&S orders are in addition to any other requirements included in the contract and do not excuse the contractor from compliance with orders for non-S&S requirements. The order limitations clause applicable to peacetime requirements does not apply to the surge quantities if it conflicts with the quantity necessary to support a contingency. The Government reserves the right to order less than the MWR or D1-D6 quantity as specified on each surge order. Multiple orders for the same NSN may be issued to support multiple contingencies. The Government reserves the right to order in excess of the MWR or D1-D6 provided the supplier accepts the order.

(1) When a surge order is issued and Government investment is used to establish the S&S capability, the supplier must use funds generated from the order to refresh or replace S&S material (e.g., inventories of lead-time materials, partially finished units, or finished product) consumed within ninety (90) days to support future S&S requirements.

(2) When a surge order is issued and no Government investment is used to establish the S&S capability, the supplier must replace S&S material (e.g., inventories of lead-time materials, partially finished units, or finished product) consumed within ninety (90) days to support future S&S requirements.

m. Contract Expiration or Termination. The Contracting Officer will notify the supplier and exercise the approved S&S exit strategy in accordance with the terms and conditions of the contract. The exit strategy must conserve protected S&S resources when (1) the contract expires, (2) a follow-on contract transitions to another supplier and/or (3) the requirement is eliminated by the requiring customer(s). When exercising the exit strategy, the supplier must consider peacetime demand patterns, production run levels, normal lead-times for raw materials used in the production process, and other relevant factors, and address least cost/best-value alternatives that minimize the risk of unused raw materials or the untimely disposition of other serviceable S&S assets before the contract expires.

(End of Clause)

52.217-9006 Surge and Sustainment (S&S) Requirements (Jun 2009) - ALTERNATE I

This solicitation includes items that are critical to support the Department of Defense’s ability to conduct contingency operations. These items are designated as the S&S requirements, including the Services’ go-to-war requirements. S&S requirements are identified as “Surge Quantity Option” expressed in a percent or exact quantity in this solicitation, and are in addition to peacetime quantities. The objective of this requirement is to obtain contractual coverage to meet the S&S quantities and sustainable accelerated delivery specified in this solicitation. S&S coverage includes access to production capability as well as vendor owned or managed inventory/safety stocks. Offerors will be evaluated on their ability to meet the terms and conditions of the S&S requirements. S&S requirements are defined as follows:

a. Surge and Sustainment Capability means the ability of the supplier to meet the increased quantity and/or accelerated delivery requirements, using production and/or supplier base capabilities, in support of DOD contingencies and/or emergency peacetime requirements. This capability includes both the ability to ramp-up to meet early delivery or increased requirements (i.e., Surge), as well as to sustain an increased production and delivery pace throughout the contingency (i.e., Sustainment). The spectrum of possible contingencies ranges from major theater wars to smaller-scale military operations.

b. S&S Quantity and Accelerated Delivery Schedule are identified on an individual item basis, based on the Services wartime planning requirements. The surge quantity option is expressed as a percent or an exact number with a sustainable accelerated delivery. The S&S quantity and delivery requirements are above and beyond the peacetime requirements in the schedule of supplies.

c. S&S Capability Assessment Plan (CAP), (previously known as the “Surge Plan”). The CAP provides the offeror’s method of covering the S&S quantity and delivery requirements, identification of competing priorities for the same resources, and date the contractor can provide the required S&S capability. If any of the S&S quantity and delivery requirements cannot be met, the offeror must identify the shortfall and provide the best value solutions to include a proposed investment strategy to offset the shortfall. For example, the CAP may include, but is not limited to, one of the following scenarios to address wartime delivery requirements:

(1) The S&S quantity and delivery requirements can be fully covered within the supplier’s resources.

(2) The S&S delivery schedule can be fully covered with early deliveries due to unit pack shipping.

(3) The total S&S quantity and delivery requirements can be met but at a different delivery rate, and the supplier has no cost-effective investment strategy that would improve the capability to deliver according to the quantity and delivery requirements.

(4) The total S&S quantity and delivery requirements can be met but at a different delivery rate, and includes an investment strategy that would improve the supplier’s capability to deliver according to the surge quantity option (e.g., the surge quantity option calls for 50% of estimated annual demand quantity or an exact quantity of 20 boxes) every 10 days, and the vendor can meet the schedule starting in the third ordering period but needs Government investment to become capable of meeting deliveries in the first two months).

(5) The S&S quantity and delivery requirements can be partially covered (the supplier can only provide a fraction of the total quantities specified); however, the supplier has no cost-effective investment strategy that would improve the capability to deliver at the surge quantity option.

(6) The S&S quantity and delivery requirements can be partially covered (the supplier can only provide a portion of the surge quantity option specified), and includes an investment strategy that would improve the supplier’s capability to deliver at the surge quantity option.

d. Government Investments. Use of Government investment may be considered to address S&S coverage shortfalls as specified under (c)(3) to (7) above only when it is in the Government’s best interest. Use of Government investment is limited per clause 52.217-9010. Contracting Officer (CO) approval is required for any Government investment requests and any investment costs incurred by the supplier without the explicit written approval of the CO are the sole responsibility of the supplier.

e. Agreement to Participate in S&S Validation/Testing. By submission of an offer, the supplier agrees to participate in S&S validation/testing as required by the Government to verify the stated S&S capability. Testing/Validation may include any methodology that can validate the supplier’s S&S capability. Validations will be conducted on randomly selected items by the Industrial Specialist after contract award and throughout the contract period. Validations include, but are not limited to, verification that the supplier and any subcontractor(s) have sufficient equipment, facilities, personnel, stock, pre-positioned raw material, production capabilities, visibility of supplier base resources and agreements, networks and plans for distribution (receiving, storing, packaging and issuing) and transportation services to accommodate the S&S requirements in the contract. This validation includes examination of any in-house work, review of the stock rotation plan (if applicable), and other contracts that impact the production of any added or accelerated quantities. The Government reserves the right to require validation using other methodologies when deemed appropriate. The language in this clause does not limit the Government's right, at any time after award, to perform inspections or validate the supplier's S&S capability.

f. Supplier Notification of S&S Capability Changes. The supplier agrees to maintain S&S capability to produce and/or deliver the S&S quantity identified in the Schedule of Supplies in accordance with the approved CAP and S&S terms and conditions throughout the life of the contract. Changes that negatively impact S&S capability must be reported in writing to the CO within ten (10) working days after the supplier becomes aware of such an impact. Such notification must include a revised S&S CAP with the supplier’s proposed corrective action(s) and date when the supplier can attain the required S&S capability. Refer to 52.217-9007(a) for instructions on submitting changes to the CAP.

g. Government Changes, Additions and Deletions to S&S Requirements. The identification of new S&S items in the peacetime schedule or increases in quantities of items already in the S&S schedule will be done through bilateral contract modifications. Deletion of S&S requirements or decreases in quantities will be made by the Government through unilateral contract modifications. The government reserves the right to obtain S&S requirements from other sources without liability to the supplier. This language does not relieve the supplier of the responsibility to provide, in accordance with the applicable delivery schedule, non-S&S and S&S quantities agreed to in the Schedule and CAP during the contingency.

h. Early or Unexpected S&S Requirements. The supplier shall support S&S requirements to the maximum extent practical (1) prior to the supplier achieving full S&S capability agreed to in the Schedule and the CAP, and (2) for requirements exceeding those agreed upon in the Schedule and the CAP, if agreed to by the contractor and not exceeding any applicable contract maximum dollar value or quantity. The Government reserves the right to obtain S&S requirements from other sources without liability to the supplier.

(End of Clause)